At what utilization do we consider a BIN range to be full?
For most programs, the threshold for swapping to a new BIN range is 95% utilization. However, based on the PAN burn rate and timing, the decision to swap can be made as low as at ~90%. A warning is sent out before the 95% threshold is reached to ens...